OFF-ROAD USE ONLY: This high-performance racing component is engineered exclusively for competition or sanctioned off-road use. It does not comply with federal or local emissions laws for highway operation. Installation on any vehicle registered for public roads is strictly prohibited. The end-user assumes all legal liability and risk associated with the installation and use of this product.
PHASE 1: PREPARATION & DISASSEMBLY
Step 1: Electrical & Fluid Service
-
Battery Disconnect: Disconnect the negative cables from both batteries.
-
Coolant Drainage: Remove the passenger-side inner fender liner. Release the metal clip on the lower radiator hose and pull back slightly to drain the engine coolant into a catch bucket.
-
Sensor Isolation: Unplug the Mass Air Flow (MAF) sensor connector and loosen the intake hose clamps.
Step 2: Air Induction Removal
-
Remove the primary intake tube from the engine bay.
-
Carefully remove any securing zip-ties and unplug auxiliary wiring harnesses attached to the intake assembly.
Step 3: Intake Bridge & PCV System
-
Remove the intake bridge/pipe secured by one (1) hose clamp and six (6) mounting bolts.
-
Critical: Cover the open intake ports with clean rags to prevent debris from entering the engine.
-
-
Disconnect the PCV (Positive Crankcase Ventilation) hose located on the passenger side.
PHASE 2: EGR SYSTEM EXTRACTION
Step 4: Full EGR Assembly Removal
-
Remove the four (4) bolts and nuts securing the EGR valve to the engine.
-
Disconnect all coolant lines leading to the EGR cooler assembly.
-
Extract the entire EGR valve and cooler unit from the vehicle.
-
Note: Retain the factory exhaust gasket for the installation of the block-off plate.
-
PHASE 3: INSTALLATION & COOLANT BYPASS
Step 5: High-Flow Charging Pipe Prep Pre-assemble the new charging pipe using the provided O-ring sealed baffle.
-
Tech Tip: Ensure the two (2) longer bolts are utilized on the front-facing side of the pipe for proper fitment.
Step 6: Bracket & Exhaust Block-Off
-
Support Bracket: Install the new support bracket onto the engine using a factory bolt and the supplied M10 x 20mm hex head bolt.
-
Exhaust Block-Off: Install the exhaust block-off plate using the provided 20mm and 30mm bolts. All hardware should be installed from the rear of the plate.
-
Coolant Bypass: Replace the factory EGR coolant lines with the provided performance bypass hose. This creates a direct coolant circuit from the return pipe back to the thermostat housing.
PHASE 4: FINAL REASSEMBLY
Step 7: Intake Restoration
-
Re-install the intake bridge. Ensure the front long bolts pass through the previously installed support bracket for maximum stability.
-
Re-install the PCV hose, electrical wiring harnesses, and the intake resonator.
Step 8: System Re-Initialization
-
Reconnect the alternator (AC generator) charge wire to the top terminal.
-
Re-install the Turbo Inlet Horn (plastic interface) and the PCV pipe onto the turbocharger inlet.
-
Secure the resonator box atop the inlet horn using the bottom hose clamp and the long front mounting bolt.
-
Re-install the primary air intake and reconnect the MAF sensor.
PHASE 5: TESTING & QUALITY CONTROL
Step 9: Commissioning
-
Refill the cooling system with a 50/50 mix of approved OAT coolant.
-
Start the engine and allow it to reach operating temperature.
-
Inspection: Check all block-off plates and coolant connections for leaks. Re-verify coolant levels after the first heat cycle or test drive.
POST-INSTALLATION ADVISORY
-
ECM Tuning: This hardware modification requires a compatible Race Tune to disable EGR logic and prevent "Limp Mode."
-
Maintenance: Re-torque the exhaust block-off hardware after the first 100 miles to account for thermal expansion.