Compatibility: 2011–2022 Ford Super Duty F-250 / F-350 (6.7L Powerstroke)
Product: 5" Downpipe-Back DPF Delete Performance Exhaust System
LEGAL DISCLAIMER & COMPLIANCE
OFF-ROAD USE ONLY: This high-performance racing component is engineered exclusively for competition or sanctioned off-road use. It does not comply with federal or local emissions laws for highway operation. Installation on any vehicle registered for public roads is strictly prohibited. The end-user assumes all legal liability and risk associated with the installation and use of this product.
PHASE 1: DISASSEMBLY & OEM REMOVAL
Step 1: Sensor Isolation & Exhaust Removal
-
Sensor Disconnection: Carefully remove all EGT sensors, pressure lines, and auxiliary connections from the Diesel Particulate Filter (DPF). Secure the factory harnesses safely to the chassis frame to prevent damage.
-
System Detachment: Starting at the factory downpipe flange, unscrew the primary connection. Loosen all downstream clamps from the rear of the DPF through to the tailpipe.
-
Extraction: Lubricate and extract all metal hangers from the OEM rubber isolators.
-
Tech Tip: If you prefer not to cut the factory tailpipe for removal, use a frame lift to allow the rear axle to hang freely; this provides the necessary clearance to extract the tailpipe section in one piece.
-
PHASE 2: COMPONENT INSTALLATION
Step 2: Primary Pipe Placement Align the #1 Delete Pipe with the outlet of the factory downpipe. Install the flange and secure it loosely with the hardware to allow for later alignment adjustments.
Step 3: Intermediate Pipe Integration Install Pipe #2 by connecting the tapered (narrower) end to the outlet of Pipe #1.
-
Insert the integrated metal hangers into the corresponding OEM rubber mounts and support the pipe with a stand.
-
Wheelbase Adjustment: This 5" system is designed to accommodate various cab/bed configurations and may require precision trimming of the straight section to fit your specific truck’s wheelbase.
Step 4: Extension & Muffler Delete Assembly
-
Custom Fitment: Measure the gap between the mid-pipe and the over-axle section. Trim and install the #3-2 Extension Pipe as required for a precise fit.
-
Muffler Delete: Position the #3-1 Muffler Delete Pipe onto the over-axle inlet and support it temporarily with a bracket or stand.
Step 5: Over-Axle & Tailpipe Finalization Route the #4 Over-Axle Pipe over the rear axle assembly. Connect the outlet to the #5 Tailpipe and secure all hangers into the factory rubber supports.
PHASE 3: FINAL ALIGNMENT & TORQUE
Step 6: System Calibration & Securing With the entire 5" system mounted loosely, perform a comprehensive inspection to ensure optimal clearance from the chassis, suspension, brake lines, and spare tire.
-
Adjust the pipe rotation and depth to achieve a level, professional appearance.
-
Torque Sequence: Working from the front flange connection toward the rear, tighten all clamps and hardware evenly.
POST-INSTALLATION ADVISORY
-
ECM Tuning: This hardware modification strictly requires a compatible Electronic Calibration (Race Tune) to disable the factory emissions logic. Failure to update the software will cause the vehicle to enter "Limp Mode."
-
Thermal Check: Re-torque all hardware and check for exhaust leaks after the first 50–100 miles of driving to account for material settling and thermal expansion.
